WHITNALL HIGH SCHOOL
The Need
- Single-pane windows and exterior walls at the high school are not energy-efficient.
- The high school science wing was built in 1967, and the layout creates teaching and learning challenges as well as safety concerns.
- The high school gym bleachers are aging, not ADA compliant, expensive to maintain, and create safety concerns.
- High school kitchen equipment is from the 1950s and is failing.
- The high school auditorium has torn curtains, aging sound and lighting, and lacks ADA access to the stage. HVAC equipment in the auditorium is from 1966.
- High school locker rooms date to the 1960s, have poor ventilation, and have a configuration that does not allow for adequate supervision.
- The Whitnall High School pool structure is failing. As part of the 2018 referendum, the community approved the short-term solution of replacing the pool liner. Now, that liner is nearing the end of its service life and could fail at any time. When the liner fails, Whitnall will no longer have a pool
|
WHS Science Lab
WHS Science Lab
WHS Kitchen Equipment
|
WHS Green Room
WHS Locker Room
WHS Pool
|
The Solution
- Renovate science labs
- Renovate the kitchen
- Update auditorium
- Update gymnasium
- Renovate locker rooms and restrooms
- Renovate current pool into a weights and fitness area, wrestling room, and multi-purpose space
- Build a new 8-lane competition pool with diving boards and spectator seating
The project would also:
- Replace major building systems, including air handling units, chiller, and emergency generator
- Replace aging roof sections
- Replace windows and wall panels to improve energy efficiency
|
WHS Site Plan
|
EDGERTON ELEMENTARY SCHOOL
The Need
- Edgerton’s K4 and K5 classrooms lack sufficient educational space and are much smaller in comparison to the Hales Corners Elementary spaces added in 2018. Learning is happening everywhere in the building, including in vestibules.
- Edgerton’s gym and cafeteria share a space, which creates scheduling conflicts, requires daily setup and take down of tables, and does not allow the entire school to assemble.
|
ESS needs to use all available building space for learning, including vestibules
ESS kitchen equipment
ESS Gym, Cafeteria, and Auditorium
ESS Lower Gym where students have PE when the the Upper Gym is being used for another purpose
|
|
The Solution
- Replace aging roof sections
- Build larger 5K classrooms
- Build a dedicated gym
- Create larger 4K classroom
- Reconfigure the main office
- Create dedicated cafeteria and update the kitchen
The project would also:
- Replace major building systems, including boilers, chiller, and emergency generator
- Renovate restrooms to comply with Americans with Disabilities Act (ADA) regulations
- Replace aging roof sections
- Replace window
|
EES Site Plan
|
HALE CORNERS ELEMENTARY SCHOOL
The Need
- Sections of Hales Corners Elementary that date to the 1950s do not have air conditioning.
- Single-pane windows and exterior walls are failing in the 1950 wings of Hales Corners Elementary and need to be replaced.
|
Window AC units
Thermostat showing that the temperature was hotter inside the building then it was outside
|
The Solution
- Replace aging roof sections
- Add air conditioning to the 1950’s sections of the building and the gymnasium
- Replace failing windows and wall panels in 1950s sections of the building
The project would also:
- Renovate second-floor restrooms to comply with ADA regulations
|
HCE Site Plan
|
WHITNALL MIDDLE SCHOOL
- Replace aging roof sections
The project would also:
- Renovate locker room restrooms and replace aging east gym bleachers to comply with ADA regulations
|
WMS Site Plan
|
|
|